CONGESTION IN THE PORT OF DUNKIRK

Posted in News

congestion dunkerque

Exceptional situation in the port of Dunkirk, which is reaching saturation point and causing long waiting times for full containers to enter and leave the terminal.

SIGNIFICANT TRANSIT VOLUMES

August was a very busy month for the port of Dunkirk, which handled a large quantity of goods in a short time. Volumes increased at each call and successive calls without the land evacuation capacity of full containers increasing, thus gradually reducing the space available on the terminal.

The lengthening of container dwell times, the high level of empty containers and the multiplication of port operations linked to the overstocking of equipment, result in longer appointment times and waiting times for carriers.

 

The Port of Dunkirk hopes to improve the situation quickly, in particular by finding solutions to give priority to the evacuation of empty containers and with the end of the summer vacations.

Some road hauliers, in order to face the additional costs generated by this situation, are setting up a port overload until the situation returns to normal.

 

Our teams remain at your disposal to assist you in your international transport projects.

Tags: BALGUERIE

BALGUERIE

CONTACTS
THE GROUP
SET-UPS
VALUES
NETWORK
HISTORY

HUMAN RESSOURCES
APPROVALS
NEWS

TRANSPORT

OUR SOLUTIONS
OCEAN FREIGHT
AIR FREIGHT
MULTIMODAL
CONSOLIDATION AND GROUPAGE
HAULAGE
CUSTOMS
MULTIMODAL PLATFORM
TRANSPORT QUOTATION

LOGISTICS

WINES AND SPIRITS
CONSOLIDATION AND GROUPAGE
TRADE FAIRS AND EXHIBITIONS
COOPERAGE
PERISHABLE GOODS LOGISTICS
FOREST PRODUCTS
DAIRY PRODUCTS
RECYCLED PRODUCTS
TEXTILE IMPORT

SERVICES

QUOTATION
CONTACTS
INSURANCE
GTS
CUSTOMER AREA CONNECTION
DOCUMENTATION
B2T DOCUMENTATION
TOOLS
SEARCH

G-MH2TC4VJDQ